An EWB 5750/09 open circuit cooling tower has been installed in a vehicle production plant with triple activity (terminal, mechanical, and foundry).
The polyester of this tower has been manufactured in gray at the express request of the client. The tower is equipped with SANIPACKING anti-legionella filling components, and a vibration sensor in the motors.
The assembly of this tower was carried out in only two weeks. SEE ALL THE ASSEMBLY STAGES HERE: https://www.ewkfrance.com/les-9-etapes-du-montage-dune-tour-aero-grand-volume/
Maintenance work in this tower can be carried out more easily, since stairs and platforms, large access doors, and a filling support on which you can walk if necessary, have been installed.